Skip to content
Doefin

Tool guide

What your hosting contract costs per productive kWh

Compare a hosting rate with fees and hours you pay for while machines are stopped. Use the same billing assumptions for each quote.

Doefin Research ·

This calculator converts a hosting rate into an equivalent cost per productive kWh. It adds separately billed fees to the rate. When stopped hours remain payable, the same cost is spread over fewer productive hours. The pool’s revenue deduction is then expressed as a cost adjustment.

Use this for machines you own when booked capacity remains payable during downtime or curtailment. Energy-only billing, revenue-share contracts, demand-response income and unrelated hosting income need different models.

How to use it

  1. Check the agreement and invoices. Which fees are included in the advertised rate, and do you still pay when machines stop?
  2. Enter Advertised power rate in $/kWh. Enter management and power-factor fees as percentages of that rate. Do not add a fee already included in the rate.
  3. Enter downtime and curtailment as percentages of the same period. Use records or clearly labelled assumptions. Count each stopped hour once, under one input only.
  4. Enter Pool fee as a percentage of revenue. The tool converts it to an equivalent cost for comparison; it is not an electricity charge.
  5. Compare the final rates using the same billing assumptions for both offers.
  6. Copy the URL to save the inputs. Anyone with the link can read the terms you entered.

What each setting means

Every number the calculator asks for, what it is, and where to find yours.

Advertised power rate

The starting price per kWh before the separate adjustments you enter.

Where to find it: Contract pricing schedule and invoices. Keep tax treatment consistent across comparisons.

Input limits and sample: The input accepts $0–$0.20/kWh. The illustrative default is $0.065/kWh, not a market benchmark.

Management fee

An added percentage of the advertised power rate.

Where to find it: The applicable contract fee clause.

Input limits and sample: The input accepts 0–30% of the advertised power rate. The illustrative default is 5%.

Power factor extra (if billed on kVA)

A separate percentage adjustment to the advertised rate. It is added with management fees, not compounded.

Where to find it: Use the billing terms or a charge on your host’s invoice. A machine’s power-factor specification alone may not match what you are billed.

Input limits and sample: The input accepts 0–30% of the advertised power rate. The illustrative default is 3%.

Unplanned downtime

The percentage of the period when machines were unexpectedly unavailable but you still paid for booked capacity.

Where to find it: Compare pool or site records with the invoices for the same period.

Input limits and sample: The input accepts 0–30% of hours in the period. The illustrative default is 4%.

Curtailment

The percentage of hours when machines were deliberately stopped but booked capacity was still payable. Count these separately from unplanned downtime.

Where to find it: Your agreement, invoices and site records. This model does not include curtailment credits or payments.

Input limits and sample: The input accepts 0–30% of hours in the period. The illustrative default is 6%.

Pool fee

The percentage of revenue paid to the pool, converted here to an equivalent cost for comparison.

Where to find it: Your pool terms. It is modelled by dividing the adjusted cost by one minus this percentage.

Input limits and sample: The input accepts 0–30% of revenue. The illustrative default is 2%.

Reading the answer

Effective rate

The adjusted comparison cost per productive kWh. The sample gives $0.0796/kWh.

So: Compare final costs using the same billing assumptions. The result is an equivalent cost, not an invoice, revenue or profit.

% above the advertised rate

The percentage difference from the starting advertised rate. The sample rounds to 22%.

So: Compare the final $/kWh rates as well as the percentage increases. A lower percentage increase can still leave a higher final cost.

Effective uptime

100% minus downtime and curtailment. The sample is 90%.

So: Check that the billing model fits your agreement.

After fees and after lost hours

The rows show how fees and paid lost hours change the rate. The pool-fee adjustment comes after these steps.

So: The change at each step shows how much that adjustment adds to the starting rate.

Reproduce the $0.065/kWh educational example

Use a $0.065/kWh rate, 5% management fee, 3% power-factor adjustment, 4% downtime, 6% curtailment and 2% pool fee. These are sample inputs, not observed contract terms.

  1. Add management and power-factor percentages: $0.065 × 1.08 = $0.0702/kWh.
  2. Subtract the distinct lost-hours percentages from 100%: effective uptime is 90%.
  3. Divide $0.0702 by 0.90: $0.0780 per productive kWh.
  4. Divide by 0.98 for the equivalent pool-fee adjustment: $0.0795918, displayed as $0.0796/kWh.
  5. The uplift from $0.065 is 22.449%, displayed as 22%.

The result depends on the billing terms and paid lost hours you entered. To compare another offer, treat tax, fees and paid lost hours in the same way.

Mistakes people make

  • Adding a fee that is already in the advertised rate.
  • Counting the same stopped hour as both downtime and curtailment.
  • Using this paid-capacity model for a bill that falls proportionally when machines stop.
  • Comparing percentage increases without comparing the final rates in $/kWh.

What it does not tell you

  • Booked capacity is assumed payable during lost hours. Credits, energy-only charges, curtailment compensation and revenue-share contracts need separate treatment.
  • The pool-fee calculation is an equivalent comparison adjustment, not the actual dollar charge a pool takes from revenue. Mining revenue is not an input.
  • The model does not include BTC price, difficulty, machine efficiency, hardware cost, repairs, financing, tax, deposits or resale value. It cannot determine profitability.
  • Management and power-factor percentages add once. Compounded charges or fees applied to a different base need separate arithmetic.
  • The defaults and presets are illustrative, not observed market rates. This comparison does not establish a decision threshold.

Continue exploring

The research and reference library are open to read. Preview research email preferences and report delivery; this demo sends no emails and saves no personal details.

Last reviewed . Figures marked illustrative are placeholders, not live data.